The Netherlands and Belgium are doing a joint procurement for the replacements of the Tripartite-class/Alkmaar-classminehunters. Each of the two countries is procuring six new mine countermeasure (MCM) vessels, which makes for a total of 12 MCM ships. The new MCM ships, developed by Naval Group, will include a range of unmanned systems including unmanned surface, aerial and underwater vehicles alongside towed sonars and mine identification and neutralization ROVs.[1]
Design and development
In early 2018, the Belgian and Dutch Navy signed a Memorandum of Understanding for the joint construction and financing of the ships. A list of requirements was drawn up for the new vessels. Contenders in the race were:
The Franco-Belgium consortium made up of French shipbuilders STX France and Socarenam together with Belgium's EDR are bidding for the 12 new MCM vessels. Their plan includes the construction of MCM vessels named Sea Naval Solutions and a multi-role frigate named Deviceseas, which will serve as mothership to the MCM vessels. All ships will have a strong focus on autonomous systems operations.[2]
France's Naval Group and ECA Group [fr] established Belgian subsidiary Naval & Robotics and bid for the program.[3][4]
The contract was won by Naval Group on 15 March 2019.[3][4]
The new vessels take a new approach to their task. Instead of clearing mines directly from the ship, the ship uses unmanned systems to do this from a distance.[5]
Construction
A first steel cutting ceremony for the first-in-class ship for the Belgian Navy was held on 19 July 2021, with the keel being laid on 30 November, 2021. Delivery of the first ship to the Belgian Navy is anticipated in 2024 and to the Royal Netherlands Navy in 2025.[6]
The first ship for the Dutch Navy started on the 4 March, 2022, with a steel cutting ceremony. The keel was laid on 14 June, 2022.
On 8 May 2024, the Belgian Ministry of Defence announced that contractor Belgium Naval & Robotics requested a delay to the construction of the first four vessels citing unforeseen circumstances. The delay causes the first vessel, Oostende, to be delivered 8 months later than initially planned, pushing her commissioning back to 2025. The second vessel, Vlissingen, is to be 5 to 6 months delayed, the Tournai and Scheveningen will also see delays of 2 and 1 months respectively.[7]
Ships in class
Belgium
Belgium gave the green-light to start the procurement on 26 January 2018 and approved a budget of 1.1 billion euros for the six Belgian MCM ships. Besides the Tripartite-class minehunters, the ships will also replace the Belgian logistical support ship Godetia.[8]
France - At Euronaval 2022, a partnership was signed between the Belgian, Dutch and French navies to enhance cooperation between them. As a result, the French Navy intends to order six vessels based on the City-class design to fulfill the role of BDGM motherships planned in the ongoing SLAM-F mine warfare program.[19][20]