Construction of this toll road was stalled since 2006, then started again in 2016.[2] Section 1 of the toll road, which extends from Cimanggis to Transyogi has been operating since 2020,[3] whereas the 2nd sections of the toll road has been operated 16 April 2023 and 10 July 2024.[4]
^Daelami, Muawman (10 November 2020). "Ruas Tol Cimanggis-Cibitung Seksi 1 Resmi Beroperasi" [Cimanggis-Cibitung Section I is Officially Inaugurated]. beritasatu.com (in Indonesian). Berita Satu. Retrieved 8 August 2022.