Charles/MGH station

Charles/MGH
A northbound train entering Charles/MGH station in December 2024
General information
Location170 Charles Street
Boston, Massachusetts, U.S.
Coordinates42°21′41″N 71°04′17″W / 42.3613°N 71.0714°W / 42.3613; -71.0714
Platforms2 side platforms
Tracks2
Construction
Structure typeElevated
AccessibleYes
History
OpenedFebruary 27, 1932[1]
RebuiltJune 2003–February 17, 2007
Passengers
FY201910,515 (weekday average boardings)[2]
Services
Preceding station MBTA Following station
Kendall/MIT
toward Alewife
Red Line Park Street
toward Ashmont or Braintree
Proposed services
Preceding station MBTA Following station
Terminus Blue Line Government Center
toward Wonderland
Location
Map

Charles/MGH station is a rapid transit station on the MBTA Red Line, elevated above Charles Circle on the east end of the Longfellow Bridge in the West End neighborhood of Boston, Massachusetts. The station is named for Charles Circle and the adjacent Massachusetts General Hospital (MGH) campus. It has two side platforms, with a glass-walled headhouse structure inside Charles Circle. Charles/MGH station is fully accessible.

The Cambridge subway opened in 1912; planning for an infill station at Charles Street began in 1924. After several false starts, construction of Charles station began in 1931. The Art Deco station, with cast stone headhouse and copper-sheathed platforms, opened on February 27, 1932. A pedestrian tunnel that provided station access was replaced by footbridges in 1961. The station was renamed Charles/MGH in 1973. From 2003 to 2007, the station was renovated for accessibility; a new glass entrance replaced the original structure. The proposed Red Blue Connector would extend the Blue Line to Charles/MGH, with a new underground platform level.

Station design

An elevated railway station in an urban area. The left half is patinaed copper; the right half curved glass.
The platforms (left) and headhouse

Charles/MGH station is located at Charles Circle at the west end of the West End and Beacon Hill neighborhoods. The station is on a short elevated segment that connects tracks in the median of the Longfellow Bridge to the west with an incline into the Beacon Hill Tunnel to the east.[3]: 1–7  The two elevated side platforms, 22 feet (6.7 m) above ground level, run west from Charles Circle onto the east end of the Longfellow Bridge.[4]

At their east ends, the platforms widen into passageways that lead to elevators, escalators, and stairs to the surface-level fare lobby in the center of Charles Circle. The station entrance is on the west side of the fare lobby under the tracks, with crosswalks connecting to the sidewalks on both sides of Cambridge Street.[5]: 3–6  The fare lobby and passageways are wrapped in a teardrop-shaped curved glass facade, while most of the platforms have a patinaed copper windscreen.[6]: 66 

History

Opening

A black-and-white image of a railway viaduct with a steel frame under construction around it
The station under construction in 1931

The Boston Elevated Railway (BERy) opened its Cambridge Subway from Park Street Under to Harvard on March 23, 1912. The line ran in the median of the Longfellow Bridge to cross the Charles River. Like the Lechmere extension opened the same year and the Boylston Street subway opened in 1914, the Cambridge Subway originally had no station serving the area just outside downtown Boston, to speed travel time from farther stations.[1][7]: 41  Although Bowdoin opened on an extension of the East Boston Tunnel in 1916, much of the West End and Beacon Hill neighborhoods were poorly served by the subway system.[8]

On June 2, 1924, the Massachusetts General Court passed legislation authorizing the state Department of Public Utilities (DPU) to construct an infill station at Charles Street. Following a 1924 study by the Boston Transit Department (BTD), the DPU delegated the project to the BTD on January 12, 1925.[9] That study also considered an extension of the East Boston Tunnel to Charles Street to provide a transfer between the lines.[10] The project stalled in 1926 as the $600,000 appropriated by the legislature was only sufficient for four-car platforms, while the BERy insisted on six-car platforms at a cost of $850,000 to accommodate its future plans.[11][12][13]

Despite pressure from the Massachusetts General Hospital, located adjacent to the proposed station site, the legislature again refused additional funding in 1927.[14][15] Uncertainty over whether the station would be built delayed plans to construct a traffic circle at the intersection.[16]

No further progress was made until 1930, when the BERy and BTD reached an agreement for a $350,000 station with four-car platforms.[8] The cost reduction was achieved by having the platforms on the straight track west of Charles Street, rather than the curve to the east. Plans for the station were completed in July 1930.[17] Bidding on the station opened in early July 1931, and a construction contract was awarded later that month.[18][19] Charles Circle was completed in November 1931, by which time the steel structure of the station was in place in the center of the traffic circle.[20] Charles station opened on February 27, 1932.[1][21] The station was served by Bowdoin SquarePark Square and Charles station–Massachusetts station bus routes, though a Kendall Square–Bowdoin Square route was closed with the station's opening.[22]

Charles station was designed by H. Parker from the office of Richard Clipston Sturgis.[6]: 65  The three-story headhouse structure, 42 by 70 feet (13 m × 21 m), was framed with steel and clad in cast stone.[23]: 14 [6]: 65  The first story had a rough finish, while the double-height second story and the third story (divided into two by the tracks) were smooth. The structure was Art Deco/Art Moderne in style, with decorative pilasters and a chevron panel.[3]: 1–6  The platforms had copper windscreens, also in Art Deco style.[6]: 65 [3]: 1–6  A north-south pedestrian underpass crossed the traffic circle, with stairs leading from the underpass to the station entrance.[21][24] Only the north half of the underpass was originally planned; public pressure resulted in the addition of the south half.[25] A 14-story Art Deco tower over the station, designed by H. F. Kellogg, was proposed but never built.[26]

Modifications and the MBTA

An aerial view of an elevated railway station with footbridges on either side
The station in 1986

In 1961, the pedestrian underpass was replaced by a pair of footbridges, with the south footbridge forked to reach both sides of Charles Street. The second story was modified to serve as a fare mezzanine, with a low ceiling under the trackway. Openings were cut in the walls to accommodate the footbridges.[3]: 1–6  Around half of pedestrian traffic on the footbridges was crossing the circle rather than using the station, which caused congestion in the mezzanine area.[23]: 14 

On January 13, 1961, the MTA began operating "modified express service" on the line during the morning rush hour, following the introduction of similar service on the Forest Hills–Everett line the month before. Every other train bypassed Charles and three other stations.[27] This was discontinued in September 1961 to reduce wait times at the skipped stations, most of which were outdoors.[28] In 1964, the Massachusetts Bay Transportation Authority (MBTA) replaced the Metropolitan Transit Authority, which had replaced the BERy in 1947. The MBTA designated the line as the Red Line in 1965.[1]

The final bus service at the station, a Back Bay–Downtown circulator route, was discontinued in June 1971. In December 1973, the station was renamed Charles/MGH after the nearby Massachusetts General Hospital (MGH).[1] Three southbound trains collided inside the Beacon Hill Tunnel just south of the station on August 1, 1975, injuring 132 passengers.[29][30] In 1982, the platforms were extended 120 feet (37 m) west to allow for use of six-car trains, which began operation in 1988.[31][1][23]: 15  Surveys in 1984 and 1987 found that the station was not eligible for inclusion on the National Register of Historic Places.[6]: 66 

Reconstruction

A curved glass entrances building for an elevated railway station
The new headhouse in 2018

The MBTA renovated most Red Line stations for accessibility in the 1980s and 1990s. Planning began for modifications to Charles/MGH in the late 1990s.[3]: 1–4  Although the station was determined to be eligible for inclusion on the National Register, it was in poor condition: the cast stone cladding was spalled and cracked, water infiltration had rusted steel and damaged plaster, and the mezzanine level was overcrowded.[23]: 14 [3]: 1–7  The platforms were pitted, columns were rusted, and paint was peeling.[23]: 15  Three options were developed in a 2000 design report: rehabilitation of the existing station with added elevators, a new surface-level station entrance slightly to the east inside the traffic circle, and a surface-level entrance at Cedar Street with a footbridge above the tracks and ramps down to the platforms. The second option was recommended.[23]: 63 

In June 2003, the MBTA began its $34.4 million reconstruction of the station – part of a $48.6 million project that also realigned Charles Circle.[32][33] Temporary staircases directly to the platforms were opened in May 2004.[34] The pedestrian bridges were removed, and the original headhouses were demolished in July 2004.[35] The new glass headhouse was built slightly to the east of the former headhouse location.[6]: 66  The copper platform enclosures were restored with new interior cladding to preserve some of the historic station architecture.[36]

The new entrance opened on February 17, 2007, making the station fully accessible.[35] Public art created by the community from recycled materials was installed in the fare lobby in June 2007.[37] The renovations made the station no longer eligible for National Register inclusion.[6]: 66  The renovation received the "Honor Award" from the Massachusetts Architectural Access Board in 2009.[4]

Design began in October 2019 for rehabilitation of the viaduct spans around the station, as well as the station platforms. The project will also include a new accessible station entrance west of the existing headhouse.[38] As of June 2024, design work is in progress for 75% completion, after which the project will be paused pending funding availability.[39][40]

Proposed Blue Line connection

Side and top views of blueprints of a subway station and connection to an elevated station
Plan of the two-platform scheme for the Blue Line level from the 1986 study

The Red–Blue connector is a proposed 0.4-mile (0.6 km) extension of the Blue Line from Bowdoin west under Cambridge Street, providing a direct transfer between the Red and Blue lines. The project was first proposed in 1924, and was returned to consideration in the 1978 update to the Program for Mass Transportation.[10][41] In 1991, the state agreed to build the project by 2011 as part of the settlement of a lawsuit over auto emissions from the Big Dig project.[42] This commitment was changed to design only in 2007–08 and lifted entirely in 2015.[43][44][45]

Original plans for the connector in 1986 called for a cut-and-cover tunnel extension west from Bowdoin, with an underground stub-end terminal connected to the existing Charles/MGH station. Three configurations for the Blue Line level at Charles/MGH were considered: a three-track terminal with two island platforms, a two-track terminal with one island platform and pocket tracks to the east, and a three-track terminal with one island platform (one track not used for passenger service) and pocket tracks to the east.[46] The 2010 Draft Environmental Impact Report instead called for a pair of deeper tunnels bored by a tunnel boring machine (TBM); the Charles/MGH terminal would have a single island platform with tail tracks extended to the west.[47]

A 2018 update which analyzed multiple tunneling methods maintained this station configuration.[48] In April 2019, the MBTA indicated plans to spend $15 million to design the connector in a five-year spending plan.[49] In April 2021, MGH released the Draft Project Impact Report for their expansion plans, which include space reserved for a new headhouse on the north side of Cambridge Street near North Anderson Street.[50] MBTA conceptual designs created in 2020 and released in 2021 also maintained the station configuration, with the new MGH entrance incorporated. Potential designs not chosen included one with a below-grade fare mezzanine for both lines, and one with the Blue Line platform located on the north side of Charles Circle. Construction was planned to last from 2025 to 2030.[51][52]

References

  1. ^ a b c d e f Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  2. ^ "A Guide to Ridership Data". MassDOT/MBTA Office of Performance Management and Innovation. June 22, 2020. p. 7.
  3. ^ a b c d e f Elkus-Manfredi/HDR Engineering; Epsilon Associates, Inc (February 2002). Draft Environmental Assessment (PDF). Massachusetts Bay Transportation Authority. Archived from the original (PDF) on January 8, 2006.
  4. ^ a b "2009 Architectural Access Board Design Awards - Category A". Massachusetts Architectural Access Board. 2009.
  5. ^ Red Line/Blue Line Connector Project: Draft Alternatives Analysis Technical Report (PDF). Massachusetts Department of Transportation. March 2010. Archived from the original (PDF) on August 16, 2010.
  6. ^ a b c d e f g Public Archaeology Laboratory (March 2010). "Appendix L: Historic Resources Reconnaissance Survey and Archaeological Resources Assessment". Red Line/Blue Line Connector Project: Draft Alternatives Analysis Technical Report (PDF). Massachusetts Department of Transportation. Archived from the original (PDF) on August 16, 2010.
  7. ^ Cudahy, Brian J. (1972). Change at Park Street Under; the story of Boston's subways. Brattleboro, Vt.: S. Greene Press. ISBN 978-0-8289-0173-4.
  8. ^ a b Report of the Transit Department for the Year Ending January 31, 1930. Boston Transit Department. 1931. p. 10 – via Internet Archive.
  9. ^ Annual Report of the Transit Department for the Year Ending January 31, 1925. Boston Transit Department. 1925. p. 7 – via HathiTrust.
  10. ^ a b "Plans For New Tunnel Station". Boston Globe. December 9, 1924. p. 1 – via Newspapers.com. Open access icon
  11. ^ Report of the Transit Department for the Year Ending December 31, 1926. Boston Transit Department. 1927. p. 8 – via Internet Archive.
  12. ^ "No Opposition to Boost in Subway Appropriation". Boston Globe. February 12, 1926. p. 28 – via Newspapers.com. Open access icon
  13. ^ "Ask More Money For Station". Boston Globe. February 11, 1926. p. 14 – via Newspapers.com. Open access icon
  14. ^ "Charles-St Station of Tunnel Rejected". Boston Globe. February 25, 1927. p. 1 – via Newspapers.com. Open access icon
  15. ^ "Hospital Asks More For Subway Station". Boston Globe. January 28, 1927. p. 15 – via Newspapers.com. Open access icon
  16. ^ "Shows Plan of Lodge Memorial". Boston Globe. December 21, 1927. p. 11 – via Newspapers.com. Open access icon
  17. ^ "Plans are Completed for New Tunnel Station at Charles and Cambridge Sts". Boston Globe. July 12, 1930. p. 12 – via Newspapers.com. Open access icon
  18. ^ "New Station on Cambridge St". Boston Globe. July 3, 1931. p. 10 – via Newspapers.com. Open access icon
  19. ^ "Contract Awarded for Elevated Station". Boston Globe. July 24, 1931. p. 15 – via Newspapers.com. Open access icon
  20. ^ "New Traffic Circle at Charles and Cambridge Sts in Full Operation to Prevent Jam at City's Gate". Boston Globe. November 13, 1931. p. 46 – via Newspapers.com. Open access icon
  21. ^ a b "New Charles-St Station Open". Boston Globe. February 27, 1932. p. 16 – via Newspapers.com. Open access icon
  22. ^ "New 'L' Station at Charles St to Open for Service Saturday". Boston Globe. February 24, 1932 – via Newspapers.com. Open access icon
  23. ^ a b c d e f Elkus / Manfredi Architects Ltd – HDR (August 31, 2000). Charles/MGH Station Design Summary Report (PDF) (Report). Massachusetts Bay Transportation Authority. Archived from the original (PDF) on January 2, 2010.
  24. ^ "Plate 3". Atlas of the city of Boston : Boston proper and Back Bay : from actual surveys and official plans. G.W. Bromley & Co. 1938 – via Norman B. Leventhal Map Center.
  25. ^ "Second Underpass for Station Urged". Boston Globe. July 25, 1930. p. 9 – via Newspapers.com. Open access icon
  26. ^ Cheney, Frank (2002). Boston's Red Line: Bridging the Charles from Alewife to Braintree. Arcadia Publishing. p. 50. ISBN 9780738510477.
  27. ^ "MTA Boosts Service For New Year's Eve". The Boston Globe. December 29, 1960. p. 8 – via Newspapers.com.
  28. ^ "M.T.A. Dropping Morning Express". The Boston Globe. September 27, 1961. p. 10 – via Newspapers.com.
  29. ^ Clarke, Bradley H. (1981). The Boston Rapid Transit Album. Cambridge, Mass.: Boston Street Railway Association. p. 16.
  30. ^ Claffey, Charles E.; Richwine, David (August 2, 1975). "132 hurt in rush-hour crash of 3 MBTA trains". Boston Globe. p. 1 – via Newspapers.com. Open access icon
  31. ^ "MBTA Contract No. B43PS02: Longfellow Approach Architecture and Engineering Services" (PDF). Massachusetts Bay Transportation Authority. April 29, 2019.
  32. ^ "New Charles/MGH Station Opens" (Press release). Massachusetts Bay Transportation Authority. March 27, 2007.
  33. ^ "Charles/MGH Station to Begin Modernization Project" (Press release). Massachusetts Bay Transportation Authority. June 19, 2003. Archived from the original on August 3, 2003.
  34. ^ "Charles/MGH Red Line Station Rehabilitation Project Update" (Press release). Massachusetts Bay Transportation Authority. May 11, 2004. Archived from the original on August 5, 2004.
  35. ^ a b "Charles MGH Renovation". Massachusetts Bay Transportation Authority. Archived from the original on April 6, 2008.
  36. ^ "Historic Preservation". Massachusetts Bay Transportation Authority. Archived from the original on February 8, 2017.
  37. ^ "Community Art Unveiled at Charles MGH Station" (Press release). Massachusetts Bay Transportation Authority. June 5, 2007.
  38. ^ "Capital Investment Plan Update: Initial FY23-27 program sizes and public engagement process preview" (PDF). Massachusetts Bay Transportation Authority. February 10, 2022.
  39. ^ "Longfellow Approach Viaduct Rehabilitation". Massachusetts Bay Transportation Authority. August 18, 2023. Archived from the original on August 22, 2023.
  40. ^ "Accessibility Initiatives—June 2024" (PDF). Massachusetts Bay Transportation Authority. June 25, 2024. p. 3.
  41. ^ Central Transportation Planning Staff (November 15, 1993). "The Transportation Plan for the Boston Region - Volume 2". National Transportation Library. Archived from the original on October 21, 2008.
  42. ^ United States Environmental Protection Agency (October 4, 1994). "Approval and Promulgation of Air Quality Implementation Plans; Massachusetts—Amendment to Massachusetts' SIP (for Ozone and for Carbon Monoxide) for Transit Systems Improvements and High Occupancy Vehicle Facilities in the Metropolitan Boston Air Pollution Control District)". Federal Register. 59 FR 50498.
  43. ^ United States Environmental Protection Agency (July 31, 2008). "Approval and Promulgation of Air Quality Implementation Plans; Massachusetts; Amendment to Massachusetts' State Implementation Plan for Transit System Improvements". Federal Register. 73 FR 44654.
  44. ^ "State Implementation Plan – Transit Commitments: Status Report" (PDF). Executive Office of Transportation. July 2, 2007. pp. 5–6. Archived from the original (PDF) on July 10, 2015.
  45. ^ United States Environmental Protection Agency (December 8, 2015). "Approval and Promulgation of Air Quality Implementation Plans; Massachusetts; Transit System Improvements". Federal Register. 80 FR 76225.
  46. ^ Seelye Stevenson Value & Knecht (December 1986). Bowdoin Station and Charles Street Station Connector Project Feasibility Study (PDF). Massachusetts Bay Transportation Authority. Archived from the original (PDF) on August 16, 2010.
  47. ^ Red Line/Blue Line Connector Project: Draft Environmental Impact Report (PDF). Massachusetts Department of Transportation. March 2010. Archived from the original (PDF) on January 8, 2011.
  48. ^ "Summary Memorandum: Tunnel Constructibility Study: Update to the 2010 DEIR for the Red Line/Blue Line Connector". Massachusetts Department of Transportation. October 2018.
  49. ^ Mohl, Bruce (April 10, 2019). "T makes quick fix on Red-Blue connector". Commonwealth Magazine.
  50. ^ "Appendix B: Floor Plans and Architectural Information". Draft Project Impact Report/Draft Environmental Impact Report. Massachusetts General Hospital. April 22, 2021.
  51. ^ Stoothoff, Erik (June 7, 2021). "Red Blue Connector" (PDF). Massachusetts Bay Transportation Authority.
  52. ^ "1. Executive Summary". Red Blue Connector Concept Design Report (PDF). Massachusetts Bay Transportation Authority. November 15, 2021. pp. 3, 4.
External images
image icon Charles station in 1970
image icon Charles/MGH station in 1979
image icon Temporary stairs in 2004

Media related to Charles/MGH station at Wikimedia Commons

Read other articles:

Опис файлу Опис Обкладинка саундтреку SONIC THE HEDGEHOG 4 EPISODE II Original Soundtrack Джерело https://vgmdb.net/album/33977 Час створення 2012 Автор зображення SEGA Ліцензія див. нижче Обґрунтування добропорядного використання для статті «Sonic the Hedgehog 4: Episode II» [?] Джерело https://vgmdb.net/album/33977 Мета викорис...

 

جاك دافنبورت (بالإنجليزية: Jack Davenport)‏    معلومات شخصية الميلاد 1 مارس 1973 (50 سنة)[1]  مواطنة المملكة المتحدة  الزوجة ميشيل قوميز (1 مايو 2000–)  الأب نايجل دافنبورت  الأم ماريا أيتكن  الحياة العملية المدرسة الأم مدرسة دراغون  [لغات أخرى]‏جامعة إيست أنجل

 

Si ce bandeau n'est plus pertinent, retirez-le. Cliquez ici pour en savoir plus. Cet article est orphelin. Moins de trois articles lui sont liés (avril 2022). Vous pouvez aider en ajoutant des liens vers [[Institut interafricain de formation en assurance et en gestion des entreprises]] dans les articles relatifs au sujet. Si ce bandeau n'est plus pertinent, retirez-le. Cliquez ici pour en savoir plus. La mise en forme de cet article est à améliorer (novembre 2023). La mise en forme du text...

Coordenadas: 22°51'45S 43°13'26W Cidade Universitária   Bairro do Brasil   Ponte do Saber, na Cidade UniversitáriaPonte do Saber, na Cidade Universitária Localização Distrito Ilha do Governador[1] Município Rio de Janeiro História Criado em 23 de julho de 1981 (42 anos) (data do decreto de criação) Características geográficas Área total 945,83 ha (em 2003) População total 1 556 (em 2 010)[2] hab.  • IDH 0,778[3] (em 2000)[4] Outras info...

 

Isaac Charles Parker rond 1860/1865 Isaac Charles Parker (Barnesville (Ohio), 15 oktober 1838 – Fort Smith (Arkansas) 17 november 1896) was een Amerikaans politicus en rechter. Van 1871 tot 1875 vertegenwoordigde Parker de staat Missouri in het Huis van Afgevaardigden. Hierna werd hij aangesteld als rechter in Fort Smith in het uiterste westen van Arkansas. Hier behandelde hij 13.490 zaken met 8.500 veroordelingen. 160 mensen werden door hem ter dood veroordeeld waarvan 79 vonnissen ook daa...

 

Afourar افورار ⴰⴼⵓⵔⴰⵔ Hilfe zu Wappen Afourar (Marokko) Afourar Basisdaten Staat: Marokko Marokko Region: Béni Mellal-Khénifra Provinz: Azilal Koordinaten 32° 12′ N, 6° 32′ W32.208333333333-6.5402777777778500Koordinaten: 32° 12′ N, 6° 32′ W Einwohner: 13.185 (2014[1]) Höhe: 500 m Blick über Afourar und die Felder der Tadla-EbeneBlick über Afourar und die Felder der Tadla-Ebene Afourar (auch Afourer; a...

Іван Сокіл Іван Сокіл.Народився 1867(1867)с. Добровілля Павлоградського повіту Катеринославської губернії, нині Васильківського району Дніпропетровської областіПомер 1945(1945)Дніпро, Україна Іван Сокіл (1867, с. Добровілля Павлоградського повіту Катеринославської губернії, ни...

 

طب الأقدام طبيب أقدام يُجري جراحة تقويمية فرع من طب  تعديل مصدري - تعديل   طب الأقدام[1] (بالإنجليزية: Podiatry)‏ هو فرعٌ من الطب يتخصصُ في دراسة وتشخيص والعلاج الطبي والجراحي لاضطرابات القدم والكاحل والطرف السفلي.[2] المراجع ^ Al-Qamoos القاموس - English Arabic dictionary / قاموس إنج...

 

This article is about the game show. For the song by Anthrax, see State of Euphoria. American TV series or program Make Me LaughGenreGame showPresented byRobert Q. Lewis (1958)Bobby Van (1979–80)Ken Ober (1997)Mark Cohen (1998)Narrated byGlenn Riggs (1958)Ken Roberts (1958)Bill Berry (1979)Johnny Gilbert (1979)John Harlan (1979)Lou DiMaggio (1997–98)Country of originUnited StatesProductionRunning time30 MinutesProduction companiesLukehill Productions (1979–1980 version) Paramount T...

American synchronized swimmer For the American politician, see Anita Alvarez. Anita AlvarezAlvarez at the 2016 Summer OlympicsPersonal informationNationalityAmericanBorn (1996-12-02) December 2, 1996 (age 27)Amherst, New York, U.S.[1]Height1.70 m (5 ft 7 in)Weight52 kg (115 lb)SportCountryUnited StatesSportSynchronized swimming Medal record Artistic swimming Representing  United States World Championships 2023 Fukuoka Team acrobatic routine 2023 Fuku...

 

السلطنة الجبرية 1417 – 1526   خارطة تقريبية لحدود السلطنة الجبرية في أوج اتساعها وفقًا لرأي الباحث خالد بن عزام الخالدي. سميت باسم جبر بن نبهان عاصمة الأحساء نظام الحكم دولةٌ وِراثيةٌ اللغة العربيّة الديانة الإسلام على المذهب السُّنِّي المالِكي[1] الشَّيخ، الأمير...

 

This article is about the hill region around the River Weser. For the ridge within it sometimes known as the Weser Hills, see Wesergebirge. View from Ohrberg Park to the small village of Tündern and Grohnde Nuclear Power Plant, next to the River Weser in the Upper Weser Valley and the Weser Uplands. The yellow fields are rapeseed The Weser Uplands[1] (German: Weserbergland, German pronunciation: [ˈveːzɐˌbɛʁklant]) is a hill region in Germany, between Hannoversch Münden...

Canadian singer and songwriter (born 1996) Alessia CaraCara performing at Washington's National Mall in 2018BornAlessia Caracciolo (1996-07-11) July 11, 1996 (age 27)[1]Mississauga, Ontario, CanadaOther namesAlessia (2014–2015)CitizenshipCanadaItaly[2]OccupationsSingersongwriterYears active2009–presentMusical careerGenres Pop R&B Instrument(s)VocalsLabels EP Def Jam[3] Universal Music Group[4] Websitealessiacara.comSignature Alessia Carac...

 

Royal Australian Air Force base near Katherine, Northern Territory, Australia Not to be confused with Tyndall Air Force Base. For other uses, see Tindal (disambiguation). RAAF Base TindalKatherine Tindal Civilian Airportnear Katherine, Northern Territory in AustraliaA No. 75 Squadron RAAF F-35A Lightning II at RAAF Base Tindal in 2023.The crest of RAAF TindalRAAF Base TindalLocation in the Northern TerritoryCoordinates14°31′16″S 132°22′40″E / 14.52111°S 132.377...

 

American LGBT rights activist Rea CareyCarey speaking at the 2013 Decision Day Marriage Equality rally in Freedom PlazaBorn (1966-12-22) December 22, 1966 (age 57)Alma materSmith College (1980s) Harvard UniversityTitleExecutive directorPredecessorMatt ForemanMovementLGBT rights movementSpouseMargaret ConwayChildren1 Rea Carey (born December 22, 1966) is an American lesbian, gay, bisexual and transgender (LGBT) rights activist and served as the executive director of the National LGBT...

Z shellZsh会话截图原作者Paul Falstad[1]開發者Peter Stephenson, et al.[1]首次发布1990年,​34年前​(1990)当前版本5.9 (2022年5月14日;穩定版本)[2] 源代码库sf.net/p/zsh/code/ 编程语言C操作系统跨平臺类型Unix shell许可协议MIT-like[3]网站www.zsh.org/  Z shell(Zsh)是一款可用作交互式(英语:interactive)登录的shell及脚本编写的命令解释器。Zsh对Bourne shell做出...

 

Ben Watermeyer, from a posthumous sketch in 1877. Egidius Benedictus Watermeyer (21 August 1824 - 21 September 1867), informally known simply as Ben, was a Judge and a founding Member of the Cape Legislative Assembly.[1] Early life Ben Watermeyer was born into a Cape family of German ancestry (his grandfather was originally from Hamburg). He was the second son of Frederick Stephanus Watermeyer Snr (1797-1847), and Anna Maria Ziervogel. He was a quiet and studious child, who even as a...

 

雪山獅子旗 吐蕃時期使用的軍旗 雪山獅子旗是源於吐蕃歷史上的軍旗、而於1912年設計、由十三世達賴喇嘛基於西藏地區傳統而於1918年正式確定頒布的西藏旗幟,從此收回西藏軍隊的各種軍旗,規定以後藏軍也只能使用該旗。西藏流亡政府亦以此旗為西藏國旗,是西藏“國家主權”、自由西藏、與西藏獨立運動的象征之一。[1][2][3][4][3]中華人民...

La fineScreenshot tratto dal video del branoArtistaNesli Autore/iNesli, Marco Zangirolami GenereNeo soulPop rap Pubblicazione originaleIncisioneFragile - Nesliving Vol. 2 Data13 novembre 2009 EtichettaDoner Music Durata3:43 La fine è un brano musicale del cantautore italiano Nesli, ultima traccia del quarto album in studio Fragile - Nesliving Vol. 2, pubblicato il 13 novembre 2009 dalla Doner Music. Indice 1 Descrizione 2 Video musicale 3 Cover 4 Note 5 Collegamenti esterni Descrizione I...

 

Hakusanat ”DDR” ja ”Itä-Saksa” ohjaavat tänne. Muita merkityksiä on täsmennyssivulla DDR. Itä-Saksa on myös yhtye. Saksan demokraattinen tasavaltaDeutsche Demokratische Republik 1949–1990 lippu vaakuna Saksan demokraattinen tasavalta vuosina 1956–1990. Valtiomuoto kansantasavalta Valtioneuvoston puheenjohtaja Saksan sosialistisen yhtenäisyyspuolueen pääsihteeri1 Wilhelm Pieck (1949–1960) Walter Ulbricht (1960–1973) Willi Stoph (1973–1976) Erich Honecker (1976–...

 

Strategi Solo vs Squad di Free Fire: Cara Menang Mudah!