The locomotive has one conductor's cabin on each end, connected by an internal corridor. Its total weight is 120 tonnes with a maximum weight per axle of 20 tonnes. The four stroke 16V 4000R43 engine is manufactured by MTU Friedrichshafen and generates 2200 kW at 1800 RPM.[1][2]
The locomotives are divided into two sub-models, the CKD8G and the CKD8H with the latter having a higher maximum speed and tractive force. Both have six axles with independent traction engines on each one and have both air and dynamic braking systems.[3]
Purchase and usage
The purchase agreement between the Ministry of Transport of Argentina and China CNR Corporation for 20 locomotives was signed in December 2009. The agreement also included the purchase of 220 long distance passenger carriages, while the total cost of each locomotive which arrived in Buenos Aires from China is estimated to be just under US$2 million.[4]
In November 2014 the Nigerian Government signed a contract with CRRC for refurbishment on the Abuja-Kaduna railway.[6][7] The locomotives were delivered on the 15 January 2018.[8]
See also
CSR SDD7 - another Chinese locomotive found in Argentina
CITIC-CNR - underground cars made by the same company for use in Argentina