The British Columbia Hydro and Power Authority, operating asBC Hydro, is a Canadian electric utility in the province of British Columbia. It is the main electricity distributor, serving more than 4 million customers in most areas,[3] with the exception of the City of New Westminster, where the city runs its own electrical department[4] and portions of the West Kootenay, Okanagan, the Boundary Country and Similkameen regions, where FortisBC, a subsidiary of Fortis Inc. directly provides electric service to 213,000 customers and supplies municipally owned utilities in the same area.[5] As a provincial Crown corporation, BC Hydro reports to the BC Ministry of Energy, Mines and Low Carbon Innovation, and is regulated by the British Columbia Utilities Commission (BCUC). Its mandate is to generate, purchase, distribute and sell electricity.
BC Hydro operates 32 hydroelectric facilities and two natural gas-fueled thermal power plants. As of 2014, 95 per cent of the province's electricity was produced by hydroelectric generating stations, which consist mostly of large hydroelectric dams on the Columbia and Peace rivers.[6] BC Hydro's various facilities generate between 43,000 and 54,000 gigawatt hours of electricity annually, depending on prevailing water levels. BC Hydro's nameplate capacity is about 11,000 megawatts.[7]
For the 2013-2014 fiscal year, the domestic electric sales volume was 53,018 gigawatt hours, revenue was CA$5.392 billion and net income was CA$549 million.[8]
History
BC Hydro was created in 1961 when the government of British Columbia, under Premier W. A. C. Bennett, passed the BC Hydro Act. This act led to the expropriation of the BC Electric Company and its merging with the BC Power Commission, to create the British Columbia Hydro and Power Authority (BCHPA).[9]
The BC Power Commission had been established with the Electric Power Act in 1945 by Premier John Hart. The mandate of the Power Commission was to amalgamate existing power and generating facilities across the province not served by BC Electric, and to extend service to the many smaller communities without power.[10]
Also about this time, sawmills and factories converted to electricity, further increasing the demand for electric power. BC Electric developed more hydro stations in the province. Similarly, small towns also built and operated their own power stations. More power transmission lines were also built. Dams and hydro-electric generating stations were built on Vancouver Island on the Puntledge, Jordan, and Elk rivers in the 1920s.
By the time of the First World War, private cars and jitneys were beginning to affect streetcar traffic. New dams were planned, including the diversion from the Bridge River to Seton Lake, near Lillooet, but the economic depression of the 1930s halted this business expansion. Also with the depression came an increase in the ridership, and a decrease in the maintenance of the streetcar system. In 1947, the BC Power Commission completed the John Hart Generating Station at Campbell River. In the early 1950s the ageing streetcars and interurban trains were replaced by electric trolley buses, and diesel buses. BC Electric finally completed the Bridge River Generating Station in 1960.
In 1958, BC Electric began construction of the oil-fired (later converted to natural gas) Burrard Generating Station near Port Moody. It opened in 1961 and operated only intermittently when needed. In 2001, it represented over 9% of BC Hydro's gross metered generation. The gas turbines at the Burrard Generating Station were decommissioned in 2016 to reduce reliance on fossil fuels, and the plant continues to be used as synchronous condenser facility.
On August 1, 1961, just days after company president Dal Grauer died, the BC government passed the legislation which changed BC Electric from a private company to a crown corporation known as BC Hydro.
The new corporation's responsibility including running the portions of the BC Electric Railway route still operating, for mass transit operation of the Vancouver trolley bus system (comprising a portion of the urban bus routes in Vancouver), as well as all the electric generation, transmission, and distribution operations.
In 1988, BC Hydro sold its Gas Division which distributed natural gas in the Lower Mainland and Victoria to Inland Natural Gas. Inland changed its name to BC Gas, and was sold and changed name again to Terasen Gas in 2003. In 2007 Terasen sold the gas operation to FortisBC.
In 1988, BC Hydro's remaining railway operations were sold to the Southern Railway of British Columbia.[11] BC Hydro continues to own the railbed of the former BC Electric Railway interurban route through Burnaby and New Westminster (on which a portion of the SkytrainExpo Line was built), as well as the railway from North Delta through Surrey, Langley, and Abbotsford all the way to Chilliwack (which continues to be operated by Southern Rail). A segment of the BC Hydro route through Langley is also leased to BC Rail to link the Canadian National Railway mainline, Burlington Northern Santa Fe, and the Roberts Bank Superport.[12]
In 2003 the BC government passed several pieces of legislation to redefine and regulate power utilities in British Columbia. The Transmission Corporation Act created the British Columbia Transmission Corporation (BCTC) as an independent transmission provider, but which only lasted until 2010 until being re-merged back into BC Hydro.
Also in 2003, BC Hydro privatized and outsourced many of its support functions, including 1540 of its employees in its Customer Service, Westech IT Services, Network Computer Services, Human Resources, Financial Systems, Purchasing, and Building and Office Services groups. These services were first outsourced to Accenture,[13] and later to Telus and Fujitsu.
Modern era
Between 1960 and 1980, BC Hydro completed six large hydro-electric generating projects. The first large dam was built on the Peace River near Hudson's Hope. The W. A. C. Bennett Dam was built to create an energy reservoir for the Gordon M. Shrum Generating Station, which has a capacity of 2,730 Megawatts of electric power and generated 13,810 gigawatt-hours of electricity per year on average 2012–16. When it was completed in 1968, the dam was the largest earth-fill structure ever built. The Williston Lake reservoir is the largest lake in British Columbia. A second smaller concrete dam was later built downstream, closer to Hudson's Hope for the Peace Canyon Generating Station which was completed in 1980.
Under the terms of the Columbia River Treaty with the US, BC Hydro built a number of dams and hydro-electric generating stations including two large projects at Mica and Revelstoke on the Columbia River. The Keenleyside Dam on the Columbia River north of Castlegar and the Duncan Dam north of Kootenay Lake were also built under the same treaty and are used mainly for water control. Two generators were installed at Keenleyside in 2002, though these are owned and operated by the Columbia Power Corporation (a separate Crown Corporation). Kootenay Canal Generating Station on the Kootenay River between Nelson and Castlegar was completed in 1976. The Seven Mile Dam and Generating Station on the Pend d'Oreille River near Trail were completed in 1979.
In the late 1970s and early 1980s BC Hydro investigated the feasibility of geothermal power production at Meager Creek, north of Pemberton. They concluded from their testing that the underground rock wasn't permeable enough to justify large-scale production of electricity.[14] Around the same time, BC Hydro initiated a project to develop a coal-fired thermal generating station at Hat Creek near Cache Creek, but abandoned the effort in 1981 due to strong environmental opposition.[15]
In 1989 the Power Smart and Resource Smart programs were initiated by BC Hydro to promote energy conservation as an alternative to the cost of creating new generating facilities. Since 2001, BC Hydro has focused on its conservation and energy efficiency programs, re-investing in its existing facilities, and purchasing clean, renewable energy from Independent Power Producers. According to the "British Columbia Energy Plan",[16] released in 2007, BC Hydro must ensure that clean or renewable electricity generation continues to account for at least 90 percent of total generation. As of 2014, 97 percent of BC Hydro's electricity generation comes from clean or renewable sources and this generation only emits 730,000 tonnes of CO2 annually from thermal plants.[17]
Organization and financial performance
In 1980 the BC Government established the BC Utilities Commission (BCUC) to regulate public energy utilities and to act as an independent, quasi-judicial regulatory agency regarding energy rates. BC Hydro's operations are overseen by this commission, and governed through an Electric Tariff and an Open Access Transmission Tariff.
Site C Dam
While BC Hydro initially looked at Site C on the Peace River near Fort St. John in the late 1950s, it wasn't until 1982 that it submitted a Site C development project to the British Columbia Utilities Commission (BCUC). It was turned down by the BCUC at that time.[citation needed] Another attempt to revive it in the 1990s was blocked by environmental concerns.[18] In 2004 the BC government's Energy Plan[19] instructed BC Hydro to begin discussions with First Nations, the Province of Alberta and communities to discuss Site C as a future option.[20] In May 2014, a federal-provincial Joint Review Panel released a report into the project's environmental, economic, social, heritage, and health effects.[21] A notice of Site C construction commencing in 2015 was issued July 2015.[22] Revelstoke Dam built in 1984 was the last new dam built by BC Hydro.
Independent Power Producers
The BC Hydro Public Power Legacy and Heritage Contract Act requires BC Hydro to meet the province's future needs for power through private developers. These acts have allowed Independent Power Producers (IPPs) to sell power to BC Hydro, which is required by law to buy it from them even at a loss.[23] In 2011 BC Hydro spent $567.4 million on electricity from IPPs. In 2013, BC Hydro had 127 Electricity Purchase Agreements in its supply portfolio, representing 22,200 gigawatt hours of annual energy and over 5,500 megawatts of capacity.[24] In 2013 those purchases will be $781.8 million in 2013 and $939.8 million in 2014, representing about 20% of domestic supply.[25][26]
Exports and Imports
Through its interties, BC Hydro exports and imports electric power through its wholly owned power marketing and trading subsidiary, Powerex, which was established in 1988. Powerex also markets the Canadian Entitlement energy from the Columbia River Treaty.[27] BC Hydro belongs to a power sharing consortium which includes electric utilities in Alberta, Washington, Oregon, Idaho and California. The flexibility of the interties contributes to system reliability, for example importing energy in low-water years, or importing when there is a system contingency. In 2013 British Columbia's minister of energy and mines, Bill Bennett spoke to why BC Hydro was agreeing to a $750 million settlement with California over claims Powerex manipulated electricity prices.[28]
Financial performance
Financial data 2000-2022 (year ending on March 31) millions of Canadian dollars
[29][30][31][32]
BC Hydro's Power Smart program encourages energy conservation among its residential, commercial, and industrial customers. The program also aims to promote energy saving retail products and building construction, and includes a "Sustainable Communities Program". Its in-house Resource Smart program is used to identify and implement efficiency gains at existing BC Hydro facilities. BC Hydro also practices energy conservation at its generating facilities through the continuous monitoring and efficient use of the water resources used to power its generators.
BC Hydro was committed by the BC government's Energy Plan to achieve electric power self-sufficiency in the province by 2016, with all new generation plants having zero net greenhouse gas emissions by the same year.[34] In 2013, BC Hydro released an Integrated Resource Plan which includes meeting at least 66 percent of the expected increase in electricity demand through increased energy efficiency.[35]
BC Hydro has also entered into energy purchase contracts with a new category of company created by special legislation, Independent Power Producers (IPPs) to buy electricity generated from intermittent renewable sources, mainly from small capacity run of river hydro and more recently, wind power, wood residue energy, and energy from organic municipal waste.[36] There has been some criticism of this policy on the basis that it will result in Hydro paying significantly higher rates to private producers than it would have if the power were self-generated.[37][38]
In November 2013 the BC Minister of Energy and Mines announced a 10-year plan that will keep electricity rates as low as possible. Increases during the first five years will be between 9 and 3 percent annually.[40] BC Hydro's profitability is affected by its large debt, estimated to reach five billion dollars by 2017.[41]
Smart Meters
BC Hydro's Smart Metering Program in 2011 introduced the installation of Itron C2S0D Smart meters as mandatory.[42] In 2013 BC Hydro offered the Meter Choices Program for $20 to $30 monthly.[43][44][45]
^B.C. Hydro. Power Pioneers (1998). Gaslights to gigawatts : A human history of BC Hydro and its predecessors. Vancouver: Hurricane Press. p. 135. ISBN0-9698845-2-4.
^B.C. Hydro. Power Pioneers (1998), op. cit., p. 73.
Opera Leśna LocalizaciónPaís PoloniaMunicipio SopotLocalidad Sopot, PoloniaCoordenadas 54°26′41″N 18°32′40″E / 54.4448, 18.5444Información generalApertura Julio de 1909Reapertura 2012 (?)CaracterísticasAforo 4.400 espectadores[editar datos en Wikidata] La Opera Leśna (literalmente, «Ópera del Bosque» en polaco; en alemán: Die Waldoper) es un anfiteatro a cielo abierto ubicado en la ciudad de Sopot (Polonia). Puede albergar 4400 asientos, mientras ...
Perilaku menyimpang yang juga biasa dikenal dengan nama penyimpangan sosial adalah perilaku yang tidak sesuai dengan norma sosial di masyarakat atau suatu kelompok atau aturan yang telah diinstitusikan, yaitu aturan yang telah disepakati bersama dalam sistem sosial.[1] Dalam Kamus Besar Bahasa Indonesia perilaku menyimpang diartikan sebagai tingkah laku, perbuatan, atau tanggapan seseorang terhadap lingkungan yang bertentangan dengan norma-norma dan hukum yang ada di dalam masyarakat....
Mirlo de pecho café Macho adulto.Estado de conservaciónPreocupación menor (UICN 3.1)[1]TaxonomíaReino: AnimaliaFilo: ChordataClase: AvesOrden: PasseriformesFamilia: TurdidaeGénero: TurdusEspecie: T. rufitorquesHartlaub, 1844[editar datos en Wikidata] El mirlo de pecho café[2] (Turdus rufitorques), también conocido como mirlo cuello rufo, zorzal cuellirojizo[2] o zorzal cuellirrufo,[3] es una especie de ave paseriforme de la familia Turd...
لمعانٍ أخرى، طالع الكوم (توضيح). الكوم - قرية مصرية - تقسيم إداري البلد مصر المحافظة محافظة البحيرة المركز رشيد المسؤولون السكان التعداد السكاني 7244 نسمة (إحصاء 2006) معلومات أخرى التوقيت ت ع م+02:00 تعديل مصدري - تعديل قرية الكوم هي إحدى القرى التابعة ل
This article provides insufficient context for those unfamiliar with the subject. Please help improve the article by providing more context for the reader. (April 2023) (Learn how and when to remove this template message) History and science museum in Iowa, United StatesPutnam Museum and Science CenterEstablished1867[1]LocationDavenport, Iowa, United StatesTypeHistory and science museumDirectorRachael Mullins (CEO)Public transit access Davenport CitiBusWebsitewww.putnam.org The Putnam...
American business executive and banker (1882–1960) Roy Young4th Chairman of the Federal ReserveIn officeOctober 4, 1927 – August 31, 1930PresidentCalvin CoolidgeHerbert HooverDeputyEdmund PlattPreceded byDaniel Richard CrissingerSucceeded byEugene MeyerMember of the Federal Reserve BoardIn officeOctober 4, 1927 – August 31, 1930PresidentCalvin CoolidgeHerbert HooverPreceded byDaniel Richard CrissingerSucceeded byMenc Szymczak4th President of the Federal Reserve Bank of...
MasayaOwnerExtreme Co., Ltd.CountryJapanIntroduced1985 (1985)MarketsJapanPrevious ownersNippon Computer SystemsWebsitewww.masayagames.com Masaya Games (メサイヤゲームス, Mesaiya Gēmusu) is a video game brand. Masaya was initially established by Japanese entertainment company Nippon Computer Systems (NCS) in 1984 to take part in the video game market. The brand name was transferred to Extreme in November 2014.[1][2][3] Video games This list is incomplete; ...
Tonga international rugby league footballer Tesi NiuNiu in 2022Personal informationFull nameFanitesi NiuBorn11 August 2001 (2001-08-11) (age 22)[1]Brisbane, Queensland, AustraliaHeight177 cm (5 ft 10 in)Weight94 kg (14 st 11 lb)Playing informationPositionFullback, Wing, Centre Club Years Team Pld T G FG P 2020–22 Brisbane Broncos 32 11 0 0 44 2023– Dolphins 17 5 0 0 20 Total 49 16 0 0 64 Representative Years Team Pld T G FG P 20...
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Paramount Theatre Aurora, Illinois – news · newspapers · books · scholar · JSTOR (July 2013) (Learn how and when to remove this template message) Paramount TheatreAddress23 E. Galena Blvd.LocationAurora, IllinoisOwnerAurora Civic Center AuthorityCapacity1,...
Disambiguazione – Se stai cercando altri significati, vedi Posidonio (disambigua). Busto di Posidonio. Copia di epoca augustea (23 a.C. - 14 d.C. circa) di un originale del 100-50 a.C. circa conservata al Museo Archeologico di Napoli (inv. 6142) Posidonio, di Apamea, detto di Rodi (in greco antico: Ποσειδώνιος?, Poseidṓnios; Apamea, 135 a.C. circa – Rodi, 50 a.C.), è stato un filosofo, geografo e storico greco antico. Appartenente alla scuola stoica, fu considerato il più g...
Kashmiri weather forecasterFaizan ArifPersonal detailsBorn20 April 2001 (age 22-23)Srinagar, Jammu and KashmirNationalityIndianParentArif Jeelani Keng Muneera TabasumEducationB.Sc. (H) PhysicsAlma materR.P. School Alamdar Colony, Green Valley Educational Institute, Amity University Uttar PradeshOccupationStudent, Independent weather forecasterWebsitehttps://twitter.com/Kashmir_Weather Faizan Arif, professionally known as 'KASHMIR WEATHER', is an independent weather forecaster and columnist ba...
2009 film by Kevin Tancharoen FameTheatrical release posterDirected byKevin TancharoenScreenplay byAllison BurnettBased onFameby Christopher GoreProduced by Richard Wright Mark Canton Tom Rosenberg Gary Lucchesi Starring Debbie Allen Charles S. Dutton Kelsey Grammer Megan Mullally Bebe Neuwirth Asher Book Kristy Flores Paul Iacono Paul McGill Naturi Naughton Kay Panabaker Kherington Payne Collins Pennie Walter Perez Anna Maria Perez de Tagle CinematographyScott KevanEdited byMyron KersteinMus...
German political party Not to be confused with Basic Income Party. Basic Income Alliance Bündnis GrundeinkommenAbbreviationBGELeaderMartin SonnabendFounded25 September 2016 (2016-09-25)HeadquartersDriesener Straße 1010439 Berlin, GermanyIdeologyUniversal basic incomeWebsitewww.buendnis-grundeinkommen.dePolitics of GermanyPolitical partiesElections The Basic Income Alliance (German: Bündnis Grundeinkommen, abbreviated BGE) is a German single-issue political party that advocat...
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these template messages) This article includes a list of general references, but it lacks sufficient corresponding inline citations. Please help to improve this article by introducing more precise citations. (October 2015) (Learn how and when to remove this template message) This article possibly contains original research. Please improve it by verifying the claims ...
2000 book, eds. Alice Crary & Rupert Read This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: The New Wittgenstein – news · newspapers · books · scholar · JSTOR (May 2017) (Learn how and when to remove this template message) The New Wittgenstein EditorsAlice CraryRupert ReadCountryUnited KingdomLanguageEngli...
ElGrandeTotoMoroccoBornTaha Fahssi طه فحصي (1996-08-03) 3 August 1996 (age 27)Casablanca, MoroccoOccupationRapperMusical careerInstrument(s)VocalsLabelsRCA Records / Sony Music France Websitehttps://instagram.com/elgrandetoto?igshid=MzRlODBiNWFlZA== Taha Fahssi (Arabic: طه فحصي, born 3 August 1996), known by his stage name ElGrandeToto or Toto, is an Moroccan rapper, performing in Darija, French and English (usually mixing between them). He is the most listened artist in the ...
German music duo You can help expand this article with text translated from the corresponding article in German. (February 2016) Click [show] for important translation instructions. View a machine-translated version of the German article. Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into ...
City and non-metropolitan district in Norfolk, England This article is about the city in England. For other uses, see Norwich (disambiguation). City and non-metropolitan district in EnglandNorwichCity and non-metropolitan districtCity of NorwichClockwise from top left: Princes Street, Norwich Cathedral, Norwich City Hall, Norwich Castle, St John the Baptist Cathedral FlagCoat of armsNickname: The City of Stories[1]Location within NorfolkNorwichLocation within EnglandShow map of E...
Civil disobedience and revolt in the Indian Independence Movement Mahatma Gandhi with Vallabhbhai Patel at the Satyagraha. Kasturba Gandhi could be seen sitting behind Gandhi. The Bardoli Satyagraha, was a farmers' agitation and nationalist movement in India against the increased taxation of farmers by the colonial government. It demanded a cancellation of the 22% tax hike being levied in Bombay Presidency. The movement began on 12 June 1928. It was eventually led by Sardar Vallabhbhai Patel,...