Ground was broken for the hospital on April 18, 2011.[5] The design was a joint venture between NBBJ and Blitch Knevel Architects.[6] The construction was managed by a joint venture between Skanska USA Building and MAPP Construction.[6]
The 213,677 square-meter (2.3 million square-foot) hospital features three patient towers with 446-acute care beds, including 60 behavioral health beds, 19 operating rooms, 76 pre-op and post-op bays, 56 emergency department exam rooms, nine acute treatment rooms and five trauma rooms.[8] The facility is completely accredited by The Joint Commission (TJC).
The hospital is located on 15 hectares (37 acres), and critical areas are all situated at least 6.4 meters (21 feet) above base flood elevation. The facility also features emergency backup power and storm-resistant technology, which will enable it to withstand the impact of a Category 3 major hurricane.[9]