A plateway is an early kind of railway, tramway or wagonway, where the rails are made from cast iron. They were mainly used for about 50 years up to 1830, though some continued later.
Plateways consisted of L-shaped rails, where the flange on the rail guides the wheels, in contrast to edgeways, where flanges on the wheels guide them along the track.
Plateways were originally horsedrawn but, later on, cable haulage and small locomotives were sometimes used.
The plates of the plateway were made of cast iron, often fabricated by the ironworks that were their users.[1] On most lines, that system was replaced by rolled wrought iron (and later steel) "edge rails" which, along with realignment to increase the radius of curves, converted them into modern railways, better suited to locomotive operation.
The plates of a plateway generally rested on stone blocks or sleepers, which served to spread the load over the ground, and to maintain the gauge (the distance between the rails or plates). The plates were usually made from cast iron and had differing cross sections, depending on the manufacturer. They were often very short, typically about 3 feet (0.9 m) long, able to stretch only from one block to the next.
The L-section plateway was introduced for underground use in about 1787, by John Curr of Sheffield Park Colliery.[3]Joseph Butler, of Wingerworth near Chesterfield, constructed a line using similarly flanged plates in 1788. A leading advocate of plate rails was Benjamin Outram, whose first line was from quarries at Crich to Bullbridge Wharf on the Cromford Canal. The early plates were prone to break, so different cross sections were employed, such as one with a second flange underneath. Some lines later introduced chairs to support the plates on the blocks, and wrought iron plates, increasing the length to 6 feet (1.8 m) and, later, 9 feet (2.7 m), spanning several sleeper blocks[4]
An alternative design, with the flange on the outside designed to be additionally used with flanged wheels, was unsuccessfully trialled on the Monmouthshire Canal Company's line shortly before its reconstruction as a modern railway. That idea was taken up in 1861 by the Toronto streetcar system. Horsecars ran on the upper, outer part as edgerail, with the wheel flanges on the inside. The edge rail formed an outside flange for a broad foot which allowed wagons to pass through the unmade streets. That combination necessitated a unique, broader gauge of 4 ft 10+7⁄8 in (1,495 mm) known as the Toronto gauge.[5]
Operations
The early plateways were usually operated on a toll basis, with any rolling stock owner able to operate their wagons on the tracks. Sometimes, the plateway company was forbidden to operate its own wagons, so as to prevent a monopoly situation arising.
Because they had un-flanged wheels, wagons that ran on plateways could also run on ordinary roads.[dubious – discuss] Plateways tended to get obstructed by loose stones and grit, leading to wear. Edgeways avoid the stone obstruction problem.
Stone blocks had an advantage over timbersleepers because they left the middle of the track unhindered for the hooves of horses, but timber sleepers had an advantage over stone blocks because they prevented the track from spreading. The gauges of some tramroads increased by a couple of inches after decades of horses passing up the middle but, being loose on the axles, the wheels could usually be adjusted slightly with washers.
Level crossings could be made truly level, the carts being re-engaged with the flanges once across the roadway.[7]
Antecedents
Even older than plateways were wagonways, which used wooden rails. Despite its ancient appearance, the Haytor Granite Tramway, the track with ledges cut in stone blocks to produce a similar effect as tram plates, was contemporary with plateways, being built in 1820.[8]