The plant has 56 energy-efficient UV reactors, and cost the city $1.6 billion. Mayor Michael Bloomberg created research groups between 2004-2006 to decide the best and most cost-effective ways to modernize the city's water filtration process, as a secondary stage following the existing chlorination and fluoridation facilities. The UV technology effectively controls microorganisms such as giardia and cryptosporidium which are resistant to chlorine treatment.[5] The city staff determined that the cheapest alternatives to a UV system would cost over $3 billion. In response to this finding, Bloomberg decided to set up a public competitive contract auction. Ontario based Trojan Technologies won the contract.[6]
The facility treats 2.2 billion U.S. gallons (8.3 billion liters) of water per day. The new facility was originally set to be in operation by the end of 2012.[6][7] The facility opened on October 8, 2013.[8]