The Butterworth–Kulim Expressway E15 is an east–west oriented expressway and is concurrent with the Federal Route 4 and Asian Highway Route AH140 along its entire length. The actual starting point of the expressway is counted as Kilometre 5. Many maps have mistakenly labelled the section between Exit 1501 Kubang Sebang Interchange and Butterworth as a part of the E15 expressway; that is incorrect because the remaining 5-km section is not maintained by PLUS Malaysia Berhad but rather by Lingkaran Luar Butterworth (Penang) Sdn. Bhd.[1]
The construction of BKE started in December 1994 and was completed in September 1996.
KLBK Sdn Bhd
Konsortium Lebuhraya Butterworth-Kulim (KLBK) Sdn Bhd, commercially known as Buterworth Kulim Expressway (BKE), a wholly owned subsidiary of PLUS Expressway Berhad ("PLUS Expressways",) has been awarded the concession and contract to construct and operate the highway of dual two-lane carriageway with separate motorcycle tracks and related highway facilities for the 16.78 km highway. The concession period is for 32 years (June 1994 to June 2026, including two years construction period), after which the highway will be transferred to the Government. On 2011, the company was taken over to PLUS Malaysia Berhad and its subsidiary Projek Lebuhraya Usahasama Berhad.
Features
Geographically, the terrain between KM 5.00 (start point) and KM 11.00 is rather flat, passing through paddy field areas. From KM 11.00 to KM 19.00, the terrain is slightly undulating, where cut and fill slopes are common features. The terrain is again flat from KM 19.00 to KM 21.78 (end point), mainly passing through the estates and developing residential areas.
Geometrically, there are four grades separated interchanges and one at grade interchange along BKE. Moreover, there are nine reinforced concrete bridges (three of those are river bridges, i.e., Sungai Perai, Sungai Kulim and Sungai Kubang Semang, whereas the rest are bridges over local roads or railway track).
Tuanku Bainun Teachers Training Institute (Institut Perguruan Tuanku Bainun) (IPTB)
The Butterworth–Kulim Expressway uses opened toll systems.
Electronic Toll Collections (ETC)
As part of an initiative to facilitate faster transaction at the Lunas and Kubang Semang Toll Plazas, all toll transactions at both toll plazas on the Butterworth–Kulim Expressway will be conducted electronically via PLUSMiles, Touch 'n Go cards or SmartTAGs starting 9 September 2015. As of December 2018, the Kubang Semang Toll Plaza and the Lunas Toll Plaza have MyRFID activated on the rightmost lanes sharing the same lanes with those of SmartTAG's lanes. This allows users of MyRFID users to fully utilize those fast lane.
Motorcycles (Vehicles with two axles and two wheels)
Free
1
Private Cars (Vehicles with two axles and three or four wheels (excluding taxis and buses))
1.31
2
Vans and other small goods vehicles (Vehicles with two axles and six wheels (excluding buses))
3.20
3
Large Trucks (Vehicles with three or more axles (excluding buses))
4.80
4
Taxis
0.65
5
Buses
1.31
List of interchanges
This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table. Please consult this guideline for information on how to create one. Please improve this article if you can.(November 2021)
The Butterworth–Kulim Expressway is a 4-lane dual-carriageway expressway which allows highway users to drive at a maximum speed of 90 km/h. Upon approaching any toll plazas, highway users have to drive no faster than 60 km/h.