The Blue Line begins at its northern terminus, the Watt/I-80 station. From there it initially travels southwest in the median of I-80, utilizing a bridge from an abandoned freeway project, then parallels Roseville Road before turning westward paralleling Arden Way in North Sacramento. (It passes up the Siemens plant nearby.) Then the line turns southwest again running in the median of Del Paso Boulevard, merges into a single track crossing the 12th Street viaduct (Highway 160) over the American River. Reaching downtown, the Blue Line goes back to two tracks going south on 12th, turns west on K Street, and splits into one-way tracks for 7th and 8th Streets where it joins the Gold and Green Lines. It then turns westward on O Street, southward on 12th, then eastward in an alley paralleling Q and R Streets. After passing the 16th Street station, the Blue Line splits from the Gold Line (the Green Line terminates at 13th Street station), crossing under the Bee Bridge before going south in its own right-of-way into South Sacramento. It then jogs eastward along Cosumnes River Boulevard before crossing it and reaching its southern terminus at Cosumnes River College station.
History
The first light rail line of the RT opened March 12, 1987.[3] Initial service commenced between Watt/I-80 and 8th & O stations only for the first six months. It was extended to Butterfield that same year on September 5.[3] In all, it was an 18.3-mile (29.5 km) route between Watt/I-80 station in North Sacramento, through downtown, and continuing east on Folsom Boulevard to Butterfield Way station. It was built at a cost of $176 million ($472 million adjusted for inflation), which included the cost of vehicles and maintenance and storage facilities. Approximately $94 million of the funds needed for the project had been reallocated from a canceled plan to build a freeway to bypass I-80 Business.[4]
Much of the line, when it was first built, was single-tracked, though improvements over the 1990s allowed much of the original system to be double-tracked. The line was built mainly using portions of the Sacramento Northern Railroad and Sacramento Valley Railroad right-of-ways, coupled with use of structures of an abandoned freeway project.[citation needed] A limited portion of the route runs on streets, mainly in downtown Sacramento.
The line became more popular than anyone anticipated, necessitating further expansions and improvements to the system.
Sacramento RT has proposed extending the light rail system 11.2-mile (18.0 km) south to the town of Elk Grove in phases.
The first phase of the southern extension opened on September 26, 2003, with 6.3 miles (10.1 km) added from 16th Street station to Meadowview Road. The extension added seven new stations to the system and runs parallel to a railroad right-of-way. The light rail system was reconfigured in June 2005 with the South Line connected to the Watt I-80/Downtown Line and designated as the Blue Line.
The second phase of the southern extension opened more than a decade later on August 24, 2015, with 4.3 miles (6.9 km) added from Meadowview Road to Cosumnes River College.[5] The extension added seven new stations to the system. An additional station, Morrison Creek, was put on hold to open as an infill station until the adjacent land was developed.[6] Eventually in 2021, despite the land around the station remaining undeveloped, Morrison Creek opened to the public as a station only accessible via pedestrian and bike paths. Sacramento RT added a large parking structure at Cosumnes River College to attract riders from southern Sacramento County and boost ridership.[7][8][9]
A third planned phase which would extend the line from its current southern terminus to Elk Grove about 2 miles along Bruceville Road is on hold indefinitely due to a lack of funding. Land use and station accessibility must be improved to qualify the extension for Federal Transit Administration (FTA) grant funding. Currently construction on this project is not expected to begin until after 2040.[10][7][9][11]
An additional infill station on the line called Dos Rios station is planned between the Globe and Alkali Flat/La Valentina stations in the Dos Rios Triangle neighborhood of North Sacramento. The station is planned as part of a new housing development project that is funded by California's cap and trade system, with an opening date set for around 2023.[12]
Station listing
The following table lists the current stations of the Blue Line, from north to south.