For train journeys, Beckenham Junction is in Travelcard Zone 4. Most trains that call are operated by Southeastern, but some Southern services also call.
Facilities
The station has a car park with 88 spaces, and is usually staffed during operating hours.[5] The station also has a small convenience store, coffee kiosk and toilets, which are only available during staffing hours.[6]
Platform 2 is used for Southeastern services to London Victoria via Herne Hill & Brixton. Platform 3 is for Southeastern services to Orpington via Bromley South. Fast trains to and from London Victoria (Chatham side) also pass these platforms.
Platform 4
This platform is another terminating bay linked with the spur to the Mid-Kent Line, and is occasionally used during engineering or other disruption.
Tramlink Platforms
There are 2 Croydon Tramlink platforms outside the station. They are both used for trams to and from Wimbledon via East Croydon, which terminate here.
Additional services, including trains to and from London Blackfriars call at the station during the peak hours.
On weekends, the services between London Victoria and Orpington are reduced to two trains per hour and on Sundays, the services to and from London Bridge do not run.[7]
London Trams
Tram services at Beckenham Junction are operated by Tramlink. The tram stop is served by trams every 10 minutes to Wimbledon via Croydon. This is reduced to a tram every 15 minutes on Saturday evenings and Sundays.[8][9]
The station was opened by the Mid-Kent Railway (MKR) on 1 January 1857[10] as the terminus of the line from Lewisham; it became a junction on 3 May 1858[11] when the West End of London and Crystal Palace Railway Farnborough Extension line from Crystal Palace to Shortlands was opened. On 1 July 1863 the London Chatham & Dover Railway Metropolitan Extension from Beckenham to Victoria/Blackfriars completed the lines serving the station. In 1863 the MKR was taken over by the South Eastern Railway (SER) and thereafter the station was operated jointly by the LCDR and SER. Despite a partial rebuilding in 1890 the original MKR building is still in use as the main station offices and booking hall.[12]
From December 2007, a significant upgrade to train services at Beckenham Junction took place, with an increase in frequency of the London Victoria to Orpington services (off peak) to every 15 mins. Until Section 2 of High Speed 1 opened in 2007 Eurostar services passed the station, but did not stop. In December 2010 Southern increased the number of evening services on Monday-Saturdays so that trains would run to London Bridge Station later into the evening.[citation needed]
Tramlink
The two platform Tramlink stop opened in 2000, with the rest of the route to the Croydon loop. The stop is outside the station, across the car park, beside the A2015 road, which avoids Beckenham town centre.[13]