After February 2008, train services on the line terminated at Wangaratta station, with road coaches operating from Wangaratta to Albury. This was due to the deteriorating track conditions between Seymour and Albury which were resulting in train speeds being reduced from 115 to 80 km/h (71 to 50 mph),[1] and trains not being able to make the return journey in the timetabled period.
On 30 May 2008, the then Premier of Victoria John Brumby announced the broad gauge track between Seymour and Albury would be converted to standard gauge, with the project to be combined with the Wodonga Rail Bypass away from the Wodonga CBD. Three V/Line passenger locomotives and 15 passenger carriages were also to be converted to standard gauge to operate the service.[2] Although the project was planned for completion by 2010,[3] it was not finished until the end of June 2011. While the gauge conversion program was being carried out, all Albury services operated as road coaches north of Seymour, connecting with trains operating between Seymour and Melbourne. 68 seats on the NSW TrainLink Melbourne-Sydney XPT service were also made available at V/Line ticket prices.[4]
Rail services on standard gauge commenced on 26 June 2011 with one service each way each day between Albury and Melbourne. A second daily train service was added from 31 October, with a third daily service commencing operations 22 April 2012, marking the end of road coach replacements on the line.[5] However, serious problems soon emerged with the condition of the standard gauge track north of Seymour, meaning that the new service became very unreliable due to speed restrictions, and trains were regularly replaced by buses.[6][7]
The North East Line Upgrade was completed in December 2020 as part of the Regional Rail Revival Program. Upgrades included track resurfacing, rail bridge upgrades, renewal of track turnouts at Violet Town and Seymour, a number of level crossing closures and upgrades, and upgrades to train stabling and accessibility at Albury station etc.[8][9][10]VLocityDMUs began running on the line on 30 December 2021.[11] The final scheduled locomotive-hauled service on the Albury line ran on 30 July 2022, and was led by V/Lines N class locomotive N464.[12] A new train timetable was introduced on 28 August 2022 with shorter journey times on all services.[13][14]
Network and operations
Routes
Interactive map of the Albury service in north eastern Victoria.
The line serves 12 stations across 304.9 kilometres (189.5 mi) of track. All stations are at ground level and within Victoria, with one station (Albury station) located in the neighbouring state of New South Wales.
The Albury service is classified by V/Line as a long-distance service and is run by six dedicated standard gauge VLocity sets, built specifically for the Albury line service. Each VLocity set consist of three carriages and accommodates 164 seats in a 2+2 configuration, six accessible spaces and storage for up to six bicycles. Toilets and luggage racks are available in addition to other amenities. The middle carriage is a buffet car, meaning cafe facilities are also available on-board all Albury services.[17][18]
The new VLocity sets had no first class cars when they were first introduced.[11] The lack of first class became irrelevant with the introduction of daily fare caps in March 2023 which removed any differentiation between first class and economy class seating.[19]
Before the VLocity sets were introduced, the service was locomotive hauled. Each individual carriage accommodated 74 seats in a 2+2 configuration, with each train set having two passenger cars and a cafe car.[20]
Operators
Prior to V/Line taking back operation of the Albury service from National Express in 2002, there had been 5 previous operators.[21] The majority of operations on the line have been government run, with these operators including the Victorian Railways, the State Transport Authority, and the Public Transport Corporation.[22]
In compliance with the Disability Discrimination Act of 1992, all stations that are new-built or rebuilt are fully accessible and comply with these guidelines.[23] The majority of stations on the corridor are fully accessible, however, there are some stations that haven't been upgraded to meet these guidelines.[24] These stations do feature ramps, however, they have a gradient greater than 1 in 14.[24] Stations that are fully accessible feature ramps that have a gradient less than 1 in 14, have at-grade paths, or feature lifts.[24] These stations typically also feature tactile boarding indicators, independent boarding ramps, wheelchair accessible myki barriers, hearing loops, and widened paths.[24][25]
Projects improving station accessibility have included the Regional Rail Revival (RRL) program, which involves station rebuilds and upgrades.[26] These works have made significant strides in improving network accessibility, with more than 58% of the stations on the line classed as fully accessible. This number is expected to grow within the coming years as works progress on the RRL.[27]