You can help expand this article with text translated from the corresponding article in French. (July 2015) Click [show] for important translation instructions.
View a machine-translated version of the French article.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing French Wikipedia article at [[:fr:Adams/Wabash]]; see its history for attribution.
You may also add the template {{Translated|fr|Adams/Wabash}} to the talk page.
The station originally had separate ticket offices, one for each platform. The station houses were painted sheet metal similar to Madison/Wabash or Quincy stations with Corinthianpilasters and Baroque style window frames.
Each of the platforms was divided in half to create separate boarding areas for the two "L" companies serving the station. Passengers wishing to transfer between trains had to enter the station house and purchase a ticket for the other company. Transfers were simplified in 1913 and passengers were then able to access the entire platform with the same ticket.[2]
In 1940, during the first renovation of the station, a footbridge was built over the tracks. In 1967 fare control was moved to the mezzanine below the tracks, replacing the original station houses on the platform level.[2] Given the high traffic at the station, the two paths (below and above the tracks) have always coexisted.
In 1987, the mezzanine and the platforms were given a new makeover. Exit stairs and control booths were installed at each end of the platforms. The roof of the station was also replaced and extended on the platforms. This work lasted 2 years.